Protection of steep excavation slopes
TILTEX 7P & TILTEX 10P was approved for a large-scale Major Water Infrastructure Upgrade Project to protect steep soil excavation batters from washing out and weakening during a lengthy construction period. TILTEX provided a watertight, concrete protection layer to the ground surface batter of the construction site whilst construction works. Rolls 5 meters wide by 20m long lengths were quickly deployed over the steep excavation batters by TILTEX Australia installation personnel providing a faster, more economic and durable alternative to shotcrete with no cost over runs and surplus shotcrete spill to remove. To ensure a successful project, TILTEX Australia ensure a quality engineering solution with detail, focus, safety and commercial advantages.