Queensland Mining Project
TILTEX 12 P Anti Cracking GCCM was recently used at a mining project in Queensland for channel spillway erosion control and embankment protection.
Over 1500 m² of TILTEX 12 P was deployed, seam bonded and hydrated by TILTEX 12 P installation personnel for a better controlled discharge of mine water into a storage dam with reduced maintenance of the spillway.
TILTEX 12 P’s 5m wide roll provided immediate cost savings in material usage, reduced the number of seams, and provided a faster seaming process, therefore requiring fewer hours for the installation.