Efficient and lasting solution

Back to application page
Back to application page

Drainage system

We recently had the pleasure of working with Ferguson Waterworks and the city of Irving, TX, on the installation of TILTEX 7. This project highlighted both the efficiency and durability of TILTEX in tackling drainage challenges.

With just one day of site preparation and 1.5 days for installation before hydration, the process was remarkably quick and straightforward. The minimal crew required and the long-term benefits—offering a 30-year lifespan with little to no maintenance—made this an outstanding solution for the city.

Gallery
Technical data
Product
TILTEX 7
Volume
5 000
Sector
Civil engineering