Railway scrap protection
The reinforcement was intended to protect the slope from being washed away by water flowing in from areas above. The project needed to be completed during the unfavorable winter season. A total of 800 m were installed by 5 people, despite the 2 challenging site conditions. 500 m were installed in 2 Bratowo and 300 m were installed in Zastowa and Baranówka. The mats were fixed with ground anchors. This solution was chosen for its durability and effectiveness in preventing erosion.