Closureof Perina Mine

Back to application page
Back to application page

Lining of drainage channels

Closure of mining operations in Perina Mine demanded of building 42 000sqm of drainage channels on mine’s slopes, in order to  capture remained sediments. In an effect, they were redirected from the mine to sediments plants and a special ponds.

Concrete lining was necessary in order to cover channels, which are of complicated shape, limited access an different geometries of the area including steep slopes.  There were considered and calculated such factors as speed and flow with acidity levels. Tiltex 7P met the requirement. Cement mat Tiltex 7P let for easy and quick application, despite of rainy season conditions

Gallery
Technical data
Product
TILTEX 7P
Volume
42 000 m²
Sector
Civil engineering