Eurobent logo
Eurobent logo
eurobent logo

Chemical containment facility, Texas

Back to application page
Back to application page

Slope stabilization in Freeport

The project goal was to provide a durable slope stabilization solution for the chemical facility’s eroding perimeter, accommodating fence, pipes, and obstructions without removing fence or restricting secured access. For this particular project TILTEX 12 was used as it provides a good solution to:

- Low Effort Installation

- Sustainability

- Cost-Effective Material

- Easy Customization

TILTEX 12 is an innovative material that addressed the erosion issue. Despite challenges, this project was completed in just 13 days. TILTEX 12 deployment streamlined the process. Its capacity to conform to the slope’s natural contour upon hydration eliminated the need for complex processes such as rebar tying or shotcrete application. Moreover, the material’s sustainability, as indicated by a 30-year warranty, offered long-term stability while minimizing ongoing maintenance requirements. In terms of cost-effectiveness, TILTEX 12 emerged as a
superior choice compared to traditional concrete or shotcrete, providing significant savings. This case study highlights how an innovative approach, coupled with meticulous planning, resulted in the successful armoring of the failing slope, safeguarding the chemical facility’s perimeter.

Gallery
Technical data
Product
TILTEX 12
Volume
5 000 m²
Sector
Civil engineering
crossmenu